Product Name: | Type2 EV Charging Pile 22KW | Output Power: | 22Kw Max |
---|---|---|---|
Product Price: | Negotiate | Working Voltage: | 380V AC~400V AC |
Warranty Time: | One Year | Work Altitude: | Below 2000m |
High Light: | Type 2 EV Charging Pile,EV Charging Pile WIFI,400V Electric Fast Charging Stations |
22KW 32A EV Charging Pile 400W Type2 Public Charging Stations
Quick Detail:
Model Number: GS22-AC-B01
Rated Voltage:40V AC
Rated Current: 32A
Rated Output Power: 22kw
Charging Port: Type 2 Cable
Cable Length: 3.5M/Customized
Communication: 3G/4G/5G, WIFI or Bluetooth Optional
Start Mode: Plug and Play/RFID card/App
Function: APP Control, screen display, Voltage Monitoring
Specifications:
Product Name | EV Charging Station (WallBox) | |||
Data | Model | GS7-AC-BO1 | GS11-AC-BO1 | GS22-AC-BO1 |
Input | Power Supply | 1P+N+PE | 3P+N+PE | 3P+N+PE |
Rated Voltage | 200~220V AC | 380~400V AC | 380~400V AC | |
Rated Current | 32A | 16A | 32A | |
Output | Output Voltage | 200~220V AC | 380~400V AC | 380~400V AC |
Output Current | 32A | 16A | 32A | |
Rated Power | 7KW | 11KW | 22KW | |
Package | Unit Size | 340*285*147mm | ||
Package Size | 570*350*310mm | 570*350*310mm | 570*350*310mm | |
Net Weight | 3.8KGS | 4.5KGS | 4.5KGS | |
Gross Weight | 6.5KGS | 6.5KGS | 6.5KGS | |
Communication | WIFI | Optional | ||
3G/4G/5G | Optional | |||
OCPP | OCPP 1.6 Json (OCPP 2.0 Optional) | |||
User Interface | Charging Port | Type 1/ Type 2 | ||
Cable Length | 3.5M or customization length | |||
LED Indicator | White/Green/Black/Blue/Orange/Purple/Customized | |||
Start Mode | Plug&Play / RFID Card / APP | |||
Emergency Stop | YES | |||
Environment | Installation | Wall-mounted Pole Mounted | ||
Work Temperature | -25℃-+50℃ | |||
Work Humidity | 5%-95% | |||
Work Altitude | <2000M |
Steps for adding APP device Download method:
For IOS: Search Smart Life in the Apple Store to downtoad and install it.
For Android: Search Smart Life in the Google Stare to download and install it.
Step 1 Add Device: Click "Add Device"
Step 2 Connect the WIFI: When adding a device for the first time, connect the device and mobile phone under the same WIFI.
Step 3 Loading: Wait until the device is loaded.
Step 4 Loading completed: After loading, click Add to enter the charging interface.
Maintainance
The power distribution system
The AC input of the charger is led out from the distribution box of the power grid,and the power shall be cut off before connection. The power on and power off steps are as follows:
1. Check whether the power supply voltage is normal.
2. Closing: first close the main switch of the distribution box, and then close the branch circuit switch in turn.
3. A switch: pull each branch circuit switch first, and then pull the main switch of the distribution box. Pull the main brake in case of emergency.