Packaging Details: | Carton, Pallet | Product Name: | Public Commercial EV Charger |
---|---|---|---|
Rated Output Power: | 22KW | Display Mode: | LED Display |
Temperature Arrange: | -25℃ To +50℃ | Input Voltage: | 400VAC, 3 Phase + N+PE |
High Light: | 3 Phase Commercial EV Charger,Commercial EV Charger 400V,EV Charge Point 22kW |
22kw 32A Public EV Charger Commercial EV Charger Electric Vehicle Charging Pile
Our EV charger has the appearance of more innovative: Minimal size,streamline design; smarter terminal control: Wireless communication(Wi-Fi/Bluetooth), OCPP communication protocol with CMS , Smart charge or scheduled charge by App.
1. It has card swiping start and remote stop start, emergency button.
2. Reservation charging function, which can be charged regularly according to user needs, and it will automatically end when fully charged.
3. The historical record function can query the historical charging record and expense record.
4.wall-mount or floor-stand installation optional.
Specifications:
Product Name | EV Charging Station (WallBox) | |||
Data | Model | GS7-AC-BO1 | GS11-AC-BO1 | GS22-AC-BO1 |
Input | Power Supply | 1P+N+PE | 3P+N+PE | 3P+N+PE |
Rated Voltage | 200~220V AC | 380~400V AC | 380~400V AC | |
Rated Current | 32A | 16A | 32A | |
Output | Output Voltage | 200~220V AC | 380~400V AC | 380~400V AC |
Output Current | 32A | 16A | 32A | |
Rated Power | 7KW | 11KW | 22KW | |
Package | Unit Size | 340*285*147mm | ||
Package Size | 570*350*310mm | 570*350*310mm | 570*350*310mm | |
Net Weight | 3.8KGS | 4.5KGS | 4.5KGS | |
Gross Weight | 6.5KGS | 6.5KGS | 6.5KGS | |
Communication | WIFI | Optional | ||
3G/4G/5G | Optional | |||
OCPP | OCPP 1.6 Json (OCPP 2.0 Optional) | |||
User Interface | Charging Port | Type 1/ Type 2 | ||
Cable Length | 3.5M or customization length | |||
LED Indicator | White/Green/Black/Blue/Orange/Purple/Customized | |||
Start Mode | Plug&Play / RFID Card / APP | |||
Emergency Stop | YES | |||
Environment | Installation | Wall-mounted Pole Mounted | ||
Work Temperature | -25℃-+50℃ | |||
Work Humidity | 5%-95% | |||
Work Altitude | <2000M |
Maintainance
The power distribution system
The AC input of the charger is led out from the distribution box of the power grid,
and the power shall be cut off before connection. The power on and power off steps are as follows:
1. Check whether the power supply voltage is normal.
2. Closing: first close the main switch of the distribution box, and then close the branch circuit switch in turn.
3. A switch: pull each branch circuit switch first, and then pull the main switch of the distribution box. Pull the main brake in case of emergency.